A Logical Consequence
The Phare continues to be a busy place. We've had a number of families, missionaries and pastors, staying with us. This week there is a large group of American college students here with Campus for Christ. Jane got a chance to talk to them about the talibe. As well as the campus work that Pascal has planned for them, they want to help some in the city in general. So, they are coming in shifts of 4 each day to help Jane and Antoinette through the middle of next week.
The exciting thing today ("Each day something new" should be our slogan) is that the electric supply cable to our property just came flopping to the ground! A car rapide was leaving with a box piled on top (the old tent on its way to help Eric T. and Aaron Toombs in Mbour). The box snagged the wires. They have been "temporarily" tied up to the wall of our building since that run-away truck plowed down the pole last year. There was clearance for garbage trucks and buses, but apparently not quite enough for that box!
We have been after SENELEC for years to fix our cable. It's an old line, repaired multiple times with splices galore. And then the pole came down. Of three phases we were supposed to receive, we have had only 2 for years. Then a couple months back we lost the second one. Still SENELEC hadn't done anything. Hopefully, now they will have no choice and will replace the whole line from the street in and we'll get our three phases and it will be like it's supposed to be!
Or maybe not... Argh.
We'll keep you posted.
The exciting thing today ("Each day something new" should be our slogan) is that the electric supply cable to our property just came flopping to the ground! A car rapide was leaving with a box piled on top (the old tent on its way to help Eric T. and Aaron Toombs in Mbour). The box snagged the wires. They have been "temporarily" tied up to the wall of our building since that run-away truck plowed down the pole last year. There was clearance for garbage trucks and buses, but apparently not quite enough for that box!
We have been after SENELEC for years to fix our cable. It's an old line, repaired multiple times with splices galore. And then the pole came down. Of three phases we were supposed to receive, we have had only 2 for years. Then a couple months back we lost the second one. Still SENELEC hadn't done anything. Hopefully, now they will have no choice and will replace the whole line from the street in and we'll get our three phases and it will be like it's supposed to be!
Or maybe not... Argh.
We'll keep you posted.
